Hayes work is the Heathrow corridor: large ground bearing slabs, hardstanding and long drainage runs where the sub base thickness is the whole job. Excavation, drainage, reinforced concrete, basements and external works in Hayes for developers and main contractors.

Work in Hayes is industrial and logistics ground, where slab thickness, sub base and long drainage runs are the whole substance of the package. In practice most of what we are asked for in Hayes is industrial and logistics slabs, with the rest of the package list available alongside it.

Bulk excavation, reduced level dig, muck away, temporary works and formation, taken from a live site down to a level the...
Read more
Foul and surface water runs, manholes and chambers, gullies, channel drainage and attenuation systems, installed to...
Read more
Reinforcement fixing, formwork, ground bearing and suspended slabs, pile caps, ground beams, walls and structural RC...
Read more
Bulk excavation, temporary works, underground drainage, RC basement formation, waterproofing, steelwork coordination and...
Read more
Excavation to formation, sub base, bedding screed, block, granite and natural stone paving, setts, kerbs, edgings and...
Read more
Blockwork, brickwork, structural alterations, builders work and soft and hard landscaping, taken on alongside the...
Read moreAcross Hayes (UB3) it is mostly industrial and logistics slabs, drainage runs and hardstanding, along with the temporary works, formation and testing that sit around all of it. Work in Hayes is industrial and logistics ground, where slab thickness, sub base and long drainage runs are the whole substance of the package. Every package is priced off drawings and a programme rather than guessed at over the phone.
No. Hayes is roughly 5 miles from the Ealing base, well inside the daily patch, so travel sits inside the package price and a site visit is normally quick to arrange.
Hayes work is the Heathrow corridor: large ground bearing slabs, hardstanding and long drainage runs where the sub base thickness is the whole job. If your scheme is near Old Vinyl Factory, send the drawings across and we will tell you what the ground and the access there normally mean for the dig before anyone prices it.
Yes, though in Hayes it is the loading rather than the planning that drives it. Industrial slabs are specified for the plant and the traffic that will sit on them, so the sub base thickness, the reinforcement and the joint layout all follow the loading schedule.
Yes, and that is the usual reason a main contractor calls us rather than three separate subcontractors. Excavation, temporary works, underground drainage, reinforcement, formwork and the pour are all delivered by the same outfit in Hayes, so the interfaces between them are ours to manage instead of yours.
Hayes is about 5 miles from the Ealing base, so a visit to walk the site and take the drawings away is quick to arrange. Actually starting on site depends on the current contracts, and we would rather give you a real date against your programme than an optimistic one.
40 Brentham Way, London, W5 1BE
Enquiries answered within one working day.
Ask about our completed developer and main contractor packages.