Basement Construction

RC basement construction in London

Bulk excavation, temporary works, underground drainage, RC basement formation, waterproofing, steelwork coordination and the suspended slab over. Tonbane delivered a 1.4m basement package for a private developer in Ealing as a single subcontract from dig to slab.

Reinforced concrete basement formation, West London, Tonbane Construction, London
Reinforced concrete basement formation, West London
What Is Included

Every basement package, covered

Dig and temporary works

Bulk excavation inside a designed temporary works scheme, with propping and support installed as the dig goes down rather than added once the face is already open.

RC box and waterproofing

Reinforced concrete walls and base slab poured as a watertight structure, with the waterproofing system installed to the designer's detail and the joints, water bars and penetrations treated as part of the design.

Drainage and services in the box

Underground drainage, sumps, pump chambers and service entries set out and cast in before the slab, because retrofitting a penetration through a finished basement wall is nobody's favourite day.

Suspended slab over

Steelwork coordinated, decking or formwork set, reinforcement fixed and the suspended RC slab poured to close the box and give the trades above a working platform.

Questions

Asked and answered

Do you do basement work under existing buildings?

We take basement packages on developer and main contractor schemes, and the scope covers excavation, temporary works, the RC box, waterproofing, drainage and the suspended slab. Where the scheme sits under or against an existing structure, the temporary works and party wall requirements are designed by the appointed engineer and we build to them.

How is the waterproofing handled?

To the waterproofing designer's detail, as a system rather than a product. The RC is poured as a watertight structure and the joints, water bars, penetrations and any cavity drainage are treated as part of the same design, which is where most basement problems are actually made or avoided.

What is the biggest basement package you have delivered?

A 1.4m reinforced concrete basement in Ealing for a private developer, covering bulk excavation, temporary works, underground drainage and attenuation, RC formation, waterproofing, structural steelwork and the suspended RC slab.

How long does a basement package take?

It depends entirely on the box, the access and the temporary works, so it is not a number we will guess at over the phone. Send the drawings and the site constraints and we will give you a programme against them.

Do you price basement work from drawings?

Yes, that is the normal route. Structural and drainage drawings, the waterproofing strategy and any temporary works information are enough for us to price a package properly.

Coverage

Basement Construction across London

Based in Ealing and working across the London boroughs most weeks, with the Bucks and Herts fringe reached on utility and commercial contracts. If your site is on the list below, a look at the drawings is a short conversation away.

Pricing a Package?

Planning a basement package?

Get In Touch

Tell us about your project

Registered Office

40 Brentham Way, London, W5 1BE

Fast Response

Enquiries answered within one working day.

References Available

Ask about our completed developer and main contractor packages.