Blockwork, brickwork, structural alterations, builders work and soft and hard landscaping, taken on alongside the groundworks so a scheme does not need a second contractor for the bits that fall between packages. One contractor from the dig through to handover.

Substructure and superstructure blockwork, brickwork and facing work, built off the levels we set ourselves rather than off somebody else's assumption.
Openings, infills, builders work in connection with services, and the structural alterations that sit between the frame and the fit out.
Soft and hard landscaping, planters, edgings and finishing works, delivered as the tail end of the same package so the site is handed over complete.
Because the dig, the drainage, the concrete and the finishing works are all ours, the interfaces between them are ours too, which is the part that usually causes the delay on a split package.
Blockwork, brickwork, builders work, structural alterations and landscaping, generally taken alongside the groundworks so the scheme has one contractor from dig to handover rather than a gap between packages.
Yes, and it is usually the sensible way round. Where we have run the groundworks and external works, the landscaping and finishing works are the same setting out and the same levels, so they are quicker and cleaner done by the same team.
Tonbane works with developers and main contractors. That is the voice of the business and the shape of the packages, so a general building enquiry from a main contractor is a much better fit than a domestic extension.
Small enabling or finishing packages get picked up where they sit alongside other work in the same part of London. In isolation they are harder to programme, so it is worth telling us what else is on the site.
Yes. Tonbane has been operating since 2019 on packages for Foran Construction, Pocket Living, Graham and Thames Water, so the prequalification, insurance and health and safety documentation is in place and available on request.
Based in Ealing and working across the London boroughs most weeks, with the Bucks and Herts fringe reached on utility and commercial contracts. If your site is on the list below, a look at the drawings is a short conversation away.
40 Brentham Way, London, W5 1BE
Enquiries answered within one working day.
Ask about our completed developer and main contractor packages.