The 535k Osier Way package for Pocket Living was ours: excavation to formation, underground drainage, sub base, bedding screed, block and granite paving, kerbs and edgings. Excavation, drainage, reinforced concrete, basements and external works in Leyton for developers and main contractors.

Leyton is active regeneration ground, and the packages there usually carry a fixed public realm specification alongside the structural work. In practice most of what we are asked for in Leyton is residential development external works, with the rest of the package list available alongside it.

Bulk excavation, reduced level dig, muck away, temporary works and formation, taken from a live site down to a level the...
Read more
Foul and surface water runs, manholes and chambers, gullies, channel drainage and attenuation systems, installed to...
Read more
Reinforcement fixing, formwork, ground bearing and suspended slabs, pile caps, ground beams, walls and structural RC...
Read more
Bulk excavation, temporary works, underground drainage, RC basement formation, waterproofing, steelwork coordination and...
Read more
Excavation to formation, sub base, bedding screed, block, granite and natural stone paving, setts, kerbs, edgings and...
Read more
Blockwork, brickwork, structural alterations, builders work and soft and hard landscaping, taken on alongside the...
Read moreAcross Leyton (E10) it is mostly residential development external works, block and granite paving, drainage, along with the temporary works, formation and testing that sit around all of it. Leyton is active regeneration ground, and the packages there usually carry a fixed public realm specification alongside the structural work. Every package is priced off drawings and a programme rather than guessed at over the phone.
No. Leyton is around 13 miles out, which is a normal run for us and how the Thames Water contract at Amersham was delivered, so travel is priced into the package rather than added on top.
The 535k Osier Way package for Pocket Living was ours: excavation to formation, underground drainage, sub base, bedding screed, block and granite paving, kerbs and edgings. If your scheme is near Osier Way, send the drawings across and we will tell you what the ground and the access there normally mean for the dig before anyone prices it.
Yes. Schemes in Leyton normally come with a public realm or drainage specification attached to the planning consent, so the paving, the kerb detail and the attenuation are fixed at design stage and priced against that rather than against a standard build up.
Yes, and that is the usual reason a main contractor calls us rather than three separate subcontractors. Excavation, temporary works, underground drainage, reinforcement, formwork and the pour are all delivered by the same outfit in Leyton, so the interfaces between them are ours to manage instead of yours.
Leyton is about 13 miles from the Ealing base, so a visit to walk the site and take the drawings away is quick to arrange. Actually starting on site depends on the current contracts, and we would rather give you a real date against your programme than an optimistic one.
40 Brentham Way, London, W5 1BE
Enquiries answered within one working day.
Ask about our completed developer and main contractor packages.